Worked exampleWe built this to show what a campaign looks like from start to finish. The organisations in it are made up, and nobody is collecting your answers for a decision. The amount it says it pays is part of the example. Nobody gets paid for answering it.
Kellerton Shire Council~9 min
How does this design hold up when you actually use the street?
Walk the Esplanade with the concept drawings and mark the spots that work and the spots that do not. What you find is read before the concept is locked in.
The drawings are done and detailed design has not started. That gap is the only window where a change is cheap, and it closes in November.
What you can change
- 01What changes in the concept before detailed design starts
- 02Which parts of the concept are kept as drawn, and which get redrawn
- 03How the remaining $180,000 of streetscape money is spent
What Kellerton Shire Council has already decided
- That the seawall works go ahead. They are funded separately.
- That the street stays two-way. The traffic assessment ruled out one-way.
- The 18-metre width. The land either side is private.
What you'll do
- 1Walk 3 places along the street, and say what you'd do at each one
- 2A few quick questions about you
- 3Look at 4 parts of the design and say what you'd keep or change
- 4Pick one of 3 packages, then spend what it leaves
- 5Check what you said, then send it
Timeline and impact
- You hear back by 20 November 2026
- Partly funded. Some of this is funded and some of it isn't. What each part depends on is set out below.
Who this is for
People aged 15 to 24 who use the Esplanade on foot, on a board or on a bike. That includes after dark, and it includes people who avoid parts of it.
About 9 min · $9